Total Project Costs Funded
$169,477,718 |
Number of Projects Closed
93 |
Cobblestone Hotel - DenmarkPACE Financing: $1,560,000
Annual Estimated Savings: $14,294 Improvements: Building Shell: Roof, Wall, and Window Upgrades, HVAC Systems, Low-flow Fixtures, Internal and External LED Lighting Lender: One Community Bank County: Brown |
Miles Kimball ApartmentsPACE Financing: $951,421
Annual Estimated Savings: $44,304 Improvements: Split System, Building Shell, Masonry, Framing, Waterproofing, DHW, Low-flow Fixtures, Internal and External LED Lighting Lender: Inland Green Capital County: Winnebago |
Charter Senior LivingPACE Financing: $3,980,560
Annual Estimated Savings: $47,764 Improvements: Building Shell: Roof, Wall, and Window Upgrades, HVAC Systems, Low-flow Fixtures, DHW, Internal and External LED Lighting Lender: ForBright Bank County: Washington |
Winter Co-opPACE Financing: $292,500
Annual Estimated Savings: $41,840 Improvements: Refrigeration, Fan Controls, EC Motors Lender: Inland Green Capital County: Sawyer |
Riverstone Suites HotelPACE Financing: $2,910,000
Improvements: Building Shell: Roof, Wall, and Window Upgrades, HVAC Systems, High Efficiency Air Conditioners, Low-flow Fixtures, DHW, Infiltration Reduction, Internal and External LED Lighting Lender: Petros PACE Finance County: Chippewa |
Home2SuitesPACE Financing: $4,627,500
Improvements: Building Shell: Roof, Wall, and Window Upgrades, HVAC Systems, , Low-flow Fixtures, DHW, Internal and External LED Lighting Lender: Nuveen Green Capital County: Sheboygan |
F Street GermantownPACE Financing: $4,535,000
Annual Estimated Savings: $78,869 Improvements: Interior and Exterior LED Lighting, Windows, Roof, Opaque Walls, Reduced Thermal Bridging, and Air Barrier Continuity Roof Top Units and Unit Heater. Lender: PACE Equity County: Washington |
F Street AppletonPACE Financing: $1,890,520
Annual Estimated Savings: $68,020 Lender: PACE Equity County: Outagamie |
Urbane 115PACE Financing: $2,107,828
Annual Estimated Savings: $159,578 Improvements: Building Shell: Roof, Wall, and Windows, Doors, HVAC Systems, Low-flow Fixtures, Gas Water Heater, Split System Heat Pumps, LED Lighting Lender: Petros PACE Finance County: Outagamie |
St. JamesPACE Financing: $896,000
Annual Estimated Savings: $63,254 Improvements: Building Shell: Roof, Insulation, Windows; HVAC, Plumbing, DHW, and Solar Lender: PACE Loan Group County: Bayfield |
Peloton ResidencesPACE Financing: $1,000,000
Annual Estimated Savings: $65,094 Improvements: Building Shell: Roof, Wall, and Window Upgrade, HVAC Systems, Low-flow Fixtures, DHW, Internal and External LED Lighting Lender: One Community Bank County: Dane |
Middleton Center 3PACE Financing: $2,400,000
Annual Estimated Savings: $62,897 Improvements: Building Shell: Roof, Wall, and Window Upgrade, HVAC Systems, Low-flow Fixtures, DHW, Internal and External LED Lighting Lender: Nuveen Green Capital County: Dane |
Mosinee HotelPACE Financing: $1,612,500
Annual Estimated Savings: $15,864 Improvements: Building Shell: Roof, Wall, and Window Upgrade, HVAC Systems, High Efficiency Air Conditioners, Low-flow Fixtures, DHW, Infiltration Reduction, Internal and External LED Lighting Lender: Northern State Bank County: Marathon |
Paoli Seven Acre DairyPACE Financing: $3,026,996
Annual Estimated Savings: $73,228 Improvements: Building Shell: Roof, Wall, and Window Upgrade, HVAC Systems, Low-flow Fixtures, DHW, Internal and External LED Lighting Lender: Nuveen Green Capital County: Dane |
Nicolet Hardwoods CorporationPACE Financing: $1,500,000
Annual Estimated Savings: $421,635 Improvements: Renewable Energy-Biomass Boiler Energy Project Lender: German American State Bank County: Forest |
Avid Oak CreekPACE Financing: $1,217,685
Annual Estimated Savings: $13,729 Improvements: Building Shell: Roof, Wall, and Window Upgrade, HVAC Systems, Low-flow Fixtures, DHW, Internal and External LED Lighting Lender: One Community Bank County: Milwaukee |
The Common PlacePACE Financing: $4,657,810
Annual Estimated Savings: $53,238 Improvements: Building Shell: Roof, Wall, and Window Upgrade, HVAC Systems, Low-flow Fixtures, DHW, Internal and External LED Lighting Lender: Petros PACE Finance County: Brown |
Woodstock Village - OshkoshPACE Financing: $1,000,000
Annual Estimated Savings: $56,654 Improvements: Building Shell; HVAC; HVAC Controls; Internal and External LED Lighting; Low-flow Fixtures, Resiliency; Storm Water Management; Water Conservation Lender: One Community Bank County: Winnebago |
The Broadacre - Oak CreekPACE Financing: $2,100,000
Annual Estimated Savings: $169,455 Improvements: High Performance Building Shell Upgrade, High Efficiency Heating/Air Conditioning Systems; Automated Energy Control Systems; High Efficiency Lighting Fixtures; Water Conservation Improvements Lender: PACE Loan Group County: Milwaukee |
Wilson Square ApartmentsPACE Financing: $2,365,000
Annual Estimated Savings: $108,849 Improvements: High Performance Building Shell Upgrade, High Efficiency Heating/Air Conditioning Systems; Automated Energy Control Systems; High Efficiency Lighting Fixtures; Water Conservation Improvements Lender: PACE Loan Group County: Eau Claire |
Krescent Valley DairyPACE Financing: $190,640
Annual Estimated Savings: $27,737 Improvements: Ground Mounted Solar Array System Lender: German American State Bank County: Washington |
Stoney Brook Storage CenterPACE Financing: $540,000
Annual Estimated Savings: $20,194 Improvements: HVAC, DX Units, Building Shell and Insulation, Interior and Exterior LED Lighting Lender: One Community Bank County: Outagamie |
Legacy HotelPACE Financing: $4,770,000
Annual Estimated Savings: $152,874 Improvements: Building Envelop, Roof, Wall and Window Upgrades, Interior and Exterior LED Lighting Upgrades, HVAC Upgrades - VFR, Low Flow Fixtures, DHW Heater Lender: One Community Bank County: Brown |
Bellevue Senior LivingPACE Financing: $1,850,000
Annual Estimated Savings: $77,909 Improvements: Building Envelop, Electric PTAC Units and Duct Furnaces, Central Gas and Water Heaters, High Efficiency Water Fixtures, LED Lighting Systems and Controls, Upgrade - VFR, Low Flow Fixtures, DHW Heater Lender: PACE Loan Group County: Brown |
Holmen Senior LivingPACE Financing: $1,958,000
Annual Estimated Savings: $80,132 Improvements: Building Envelope, Electric PTAC Units and Duct Furnaces, Central Gas and Water Heaters, High Efficiency Water Fixtures, LED Lighting Systems and Controls Lender: PACE Loan Group County: LaCrosse |
The MoxyPACE Financing: $3,500,000
Annual Estimated Savings: $170,060 Improvements: Building Envelop, Roof, Wall and Window Upgrades, Interior Lighting Upgrades, HVAC Upgrade - VFR, Low Flow Fixtures, DHW Heater Lender: One Community Bank County: Dane |
Discovery Point ApartmentsPACE Financing: $560,000
Annual Estimated Savings: $35,605 Improvements: HVAC, HVAC Controls, LED Lighting, Water Conservation Lender: One Community Bank County: Winnebago |
Springhill Suites by MarriottPACE Financing: $2,675,118
Annual Estimated Savings: $467,450 Improvements: Roof and Window Upgrades, Lighting Upgrades, HVAC Upgrades, Low Flow Fixtures, DHW Heater Lender: One Community Bank County: Waukesha |
The Sycamore - River FallsPACE Financing: $2,328,181
Annual Estimated Savings: $66,774 Improvements: Building Envelop, HVAC, LED Lighting, DHW Lender: PACE Equity County: Pierce |
New Perspective Senior Living -FranklinPACE Financing: $8,003,461
Annual Estimated Savings: $425,989 Improvements: Building Envelop, HVAC, LED Lighting, Water Conservation Lender: PACE Equity County: Waukesha |
New Perspective Senior LivingPACE Financing: $7,405,000
Annual Estimated Savings: $290,472 Improvements: Building Envelop, HVAC, LED Lighting, High Efficiency DHW Lender: PACE Equity County: Milwaukee |
Hidden Creek 2 ResidencesPACE Financing: $1,436,400
Annual Estimated Savings: $149,238 Improvements: Building Envelope, Roof, Wall and Window Upgrade, Interior LED Lighting, Packaged Terminal Air Conditioners, Low Flow Fixtures, High Efficiency DHW Lender: One Community Bank County: Dane |
Hotel Verdant - RacinePACE Financing: $8,000,000
Annual Estimated Savings: $302,915 Improvements: Building Envelope, Electrical, Plumbing, HVAC, Elevators, Renewable Energy Lender: Twain Financial County: Racine |
Cobblestone Inn and Suites (Fremont)PACE Financing: $861,260
Annual Estimated Savings: $34,731 Improvements: Building Envelope: Roof, Wall and Window Upgrades, Interior and Exterior LED Lighting, Packaged Terminal Air Conditioners, Air Handling Unit, Low Flow Fixtures and High Efficiency DHW Lender: Greenworks Lending County: Waupaca |
Cobblestone Inn and Suites (DePere)PACE Financing: $2,340,000
Annual Estimated Savings: Improvements: Air Infiltration Reduction, Roof upgrade, Wall upgrade, Window upgrade, Lighting upgrades, HVAC upgrades, Low Flow Fixtures, High Efficiency DHW Lender: Petros PACE Finance County: Brown |
Cobblestone Inn and Suites (Little Chute)PACE Financing: $1,241,137
Annual Estimated Savings: $36,011 Improvements: Air Infiltration Reduction, Roof upgrade, Wall upgrade, Window upgrade, Lighting upgrades, HVAC upgrades, Low Flow Fixtures, High Efficiency DHW Lender: Greenworks Lending County: Outagamie |
The EmersonPACE Financing: $500,000
Annual Estimated Savings: $68,305 Improvements: Building shell, HVAC, HVAC controls, LED lighting, renewable energy Lender: State Bank of Cross Plains County: Dane |
Banta Apartments
PACE Financing: $1,723,561
Annual Estimated Savings: $100,230 Improvements: Roof, wall, and window upgrade; Interior LED lighting upgrades, HVAC – Split System, HVAC - High efficiency rooftop units, Low Flow Fixtures, High Efficiency DHW Lender: Inland Green Capital County: Winnebago |
The BrinPACE Financing: $1,978,050
Annual Estimated Savings: $90,591 Improvements: Building Envelope, Lighting, Wall upgrade, HVAC - Residential, HVAC - Retail, Low flow fixtures Lender: Greenworks Lending County: Winnebago |
The Annex of OshkoshPACE Financing: $5,625,000
Annual Estimated Savings: $292,640 Improvements: Building Shell, LED Lighting, Heating, Ventilation, and Air Conditioning (HVAC), Low Flow Fixtures, Controls Lender: Petros PACE Finance County: Winnebago |
Sugar Creek Commons - Mixed Use ResidentialPACE Financing: $2,490,500
Annual Estimated Savings: $164,403 Improvements: Roof & Slab Upgrade, Wall Upgrade, Window Upgrade, Lighting Upgrades, HVAC Upgrades, Low Flow Fixtures, High Efficiency DHW Lender: Twain Financial County: Dane |
Sugar Creek Commons - Mixed Use CommercialPACE Financing: $685,000
Annual Estimated Savings: $34,386 Improvements: Roof & Slab Upgrade, Wall Upgrade, Window Upgrade, Lighting Upgrades, HVAC Upgrades; Gas Heat, HVAC - Split System Upgrade, HVAC - Gas Unit Heater Upgrade, DWH-Low Flow Fixtures, DHW Heater Lender: Twain Financial County: Dane |
The Masters Residences 2PACE Financing: $1,500,000
Annual Estimated Savings: $78,243 Improvements: Building Shell, HVAC, HVAC Control, LED Lighting, Water Conservation Lender: One Community Bank County: Dane |
Badger PackagingPACE Financing: $1,420,581
Annual Estimated Savings: $700,000 Improvements: Recycled Scrap Paper Recapture System Lender: PACE Equity County: Washington |
Wilson Square ApartmentsPACE Financing: $1,175,000
Annual Estimated Savings: $157,476 Improvements: Building Shell, HVAC, HVAC Control, LED Lighting, Low Flow Fixtures, Infiltration Reduction, Smart Thermostats Lender: PACE Loan Group County: Eau Claire |
Superior HotelPACE Financing: $2,275,000
Annual Estimated Savings: $115,258 Improvements: Roof and wall upgrades, windows and doors, Interior and exterior LED lighting, HVAC, Low-flow fixtures Lender: Petros PACE Finance County: Douglas |
Lakeshore Ridge ApartmentsPACE Financing: $1,298,164
Annual Estimated Savings: $82,728 Improvements: Building Shell, HVAC, HVAC Controls, LED Lighting, Low Flow Fixtures, DHW Heater Lender: One Community Bank County: Calumet |
Newport ShoresPACE Financing: $4,000,000
Annual Estimated Savings: $163,807 Improvements: Building Shell, HVAC, HVAC Controls, LED Lighting, Low Flow Fixtures, Smart Thermostats Lender: German American State Bank County: Dane |
Towne Place SuitesPACE Financing: $4,000,000
Annual Estimated Savings: $180,927 Improvements: Building Envelope, HVAC, Interior and Exterior LED Lighting, Low Flow Fixtures Lender: Petros PACE Finance County: Winnebago |
Best Western Plus Wausau Tower InnPACE Financing: $820,000
Annual Estimated Savings: $69,979 Improvements: HVAC, Roof and Wall Upgrades, Windows and Doors, Interior and Exterior LED Lighting, Low Flow Fixtures Lender: Inland Green Capital County: Marathon |
Green Valley DairyPACE Financing: $3,000,000
Annual Estimated Savings: $155,417 Improvements: Solar Array Lender: German American State Bank County: Shawano |
Cobblestone Inn and Suites
|
Oakmont Senior LivingPACE Financing: $2,250,847
Annual Estimated Savings: $108,918 Improvements: Wall Insulation, Windows, Interior/Exterior LED Lighting, HVAC, Low-flow Fixtures, DHW Heater Lender: Twain Financial County: Dane |
Rail Yard Innovation Office Building RPACE Financing: $1,011,520
Annual Estimated Savings: $55,471 Improvements: Roof and wall upgrades, Windows, Interior and Exterior LEDs, VAV RTUs, HVAC controls, Low Flow Faucets and Toilets, DHW Lender: Greenworks Lending |
Kettle Park West - Tru by HiltonPACE Financing: $2,050,000
Annual Estimated Savings: $59,190 Improvements: Roof, Wall, and Slab Upgrades, Windows, Interior and Exterior LEDs, Efficient RTUs Lender: Twain Financial County: Dane |
Hotel IndigoPACE Financing: $3,169,0,31 *refinance
Annual Estimated Savings: $85,449 Improvements: Roof and Wall Upgrades, Windows, Air Sealing, Variable Air Volume (VAV) Reheat System, VRF Lender: Greenworks Lending County: Dane |
F Street - Industrial FacilityPACE Financing: $1,998,390
Annual Estimated Savings: $21,273 Improvements: Interior and Exterior LEDs, Windows, Roof and Wall Upgrades, HVAC System, Variable Air Volume (VAV) for Rooftop Units (RTUs), Low Flow Faucets and Toilets Lender: PACE Equity |
Janesville Hotel Group, LLC
|
East Side Ventures, LLCPACE Financing: $150,000
Annual Estimated Savings: $10,031 Improvements: Wall and Roof Insulation, Space Heating and Cooling, Interior and Exterior LED Lighting, and Windows Lender: One Community Bank County: Dane |
Holiday Inn - Appleton (Wisco Hotel Group)PACE Financing: $550,000
Annual Estimated Savings: $19,667 Improvements: Solar PV, Roof, Upgrade, and Window Upgrade, Interior and Exterior LEDs, PTAC, FCU's, Lobby Unit, DWH Low Flow Faucets and Showers, and DHW - Heater Lender: One Community Bank County: Outagamie |
Oscar Mayer StationPACE Financing: $7,077,000
Annual Estimated Savings: $304,600 Improvements: HVAC Boilers, Chillers and Air Handling Units, LED Lighting Upgrades, Electrical Optimization and Submetering, Lobby Windows, and Low Flow Fixtures Lender: Greenworks Lending County: Dane |
Oak Park PlacePACE Financing: $3,343,182
Annual Estimated Savings: $159,700 Improvements: Envelope Wall, Window and Roof Upgrades, Interior and Exterior LED Lighting, HVAC Upgrade - WSHP, DWH - Low Flow Faucets and Showers, DWH Heater Lender: Twain Financial County: Rock |
Fairfield Inn & Suites (Wisco Hotel Group)PACE Financing: $450,000
Annual Estimated Savings: $19,384 Improvements: Rooftop Solar, Internal and Exterior LED Lighting, Roof and Wall Upgrades Lender: One Community Bank County: Sheboygan |
Wild Rice RetreatPACE Financing: $867,000
Annual Estimated Savings: $99,111 Improvements: Energy-Efficient HVAC, Building Envelope, High Efficiency Windows, LED Lighting, High Efficiency Faucets, and High Efficiency Showers Lender: PACE Loan Group County: Bayfield |
University Lofts (1615 W New York Avenue, LLC)PACE Financing: $900,000
Annual Estimated Savings: $65,733 Improvements: Interior and Exterior Lighting, Exterior Security Lighting, Code Updates, Outer Walls/Infiltration, Ceiling Insulation, Windows, Efficient Boiler, Low Flow Fixtures, Fixed Appliances Lender: One Community Bank County: Winnebago |
Riverwood Eagle's Nest, LLCPACE Financing: $1,600,000
Annual Estimated Savings: $86,300 Improvements: Interior and Exterior LED Lighting, Domestic Water Heating, DWH Low Flow Fixtures, HVAC - Packaged Terminal Air Conditioners, Windows, Wall Upgrade, Roof Amp; Slab upgrade, HVAC - Split System, HVAC - Energy Recovery Lender: One Community Bank County: Columbia |
Avant ApartmentsPACE Financing: $590,000
Annual Estimated Savings: $35,172 Improvements: Thermal Protection - Wall Upgrade and Roof/Slab, Windows and Window Treatments, HVAC, PTAC, LED Lighting, DWH – Low Flow Faucets, Showers, and Heater Lender: One Community Bank County: Outagamie |
VMP HoldingsPACE Financing: $875,000
Annual Estimated Savings: $43,019 Improvements: Building Envelope, High Efficiency Mini Split System (Elevator Room), High Efficiency Split System (Main Floor Common Area), PTACS, Commercial Water Heaters, LED, Low Flow Fixtures, and Hydraulic Elevator Lender: PACE Loan Group County: Racine |
Spooner Civic and Community Center (Spooner Storage Rink)PACE Financing: $206,071
Annual Estimated Savings: $42,223 Improvements: Rooftop Solar Lender: Greenworks Lending County: Washburn |
DDL Holdings, LLC. (Larsen Green Condominium Project)PACE Financing: $800,000
Annual Estimated Savings: $82,915 Improvements: Building Envelope, HVAC, Lighting and Hot Water Improvements Lender: PACE Equity County: Brown |
The Goose & Twig Inn
PACE Financing: $147,191
Annual Estimated Savings: $5,839 Improvements: Multi-zone Heat Pump Ductless System, Windows, Wall and Attic Insulation and PV Panels, Low-flow Faucets, Showers, and High Efficiency DHW Lender: Greenworks Lending County: Door |
West Milwaukee Hotel, LLC (Fairfield Inn & Suites)PACE Financing: $1,142,000
Annual Estimated Savings: $81,119 Improvements: Building Envelop Upgrades, HVAC-PTAC, LED Lighting, High Efficiency Air Handling Units, DOAS and DOAS Heat Recovery, Low-flow Faucets, Showers, and High Efficiency DHW Lender: Baker Tilly County: Milwaukee |
Green Bay Business Center
|
Green Bay Business Center
|
Cobblestone Hotel and Suites - Hartford
|
Cobblestone Hotel and Suites - Chippewa Falls Hotels International, LLCPACE Financing: $661,000
Annual Estimated Savings: $29,525 Improvements: Building envelope, roof and wall upgrade, PTAC/VTAC, air handling unit, pool area unit, interior LEDs, low flow faucets, heater, and exterior LEDs Lender: Twain Financial County: Chippewa |
Cobblestone Hotel and Suites - Stevens Point
|
TownePlace SuitesPACE Financing: $2.5 Million
Annual Estimated Savings: $110,931 Improvements: Roof and wall insulation, upgraded windows, interior and exterior LED lighting, energy-efficient HVAC equipment (air conditioners and furnace), energy-efficient pool heater, and low-flow faucets and showers. Lender: One Community Bank County: Milwaukee |
Hotel NorthlandPACE Financing: $8,759,000
Annual Estimated Savings: $453,946 Improvements: Roof and wall insulation, LED lighting, heating ventilation and air conditional (HVAC) central plant, HVAC air handling and fan coiling units, low-flow showers and faucets, and exterior LEDs. Lender: CCG PACE Funding, LLC County: Brown |
Prestige Worldwide Enterprises, LLC.
PACE Financing: $250,000
Annual Estimated Savings: $2,868 Improvements: Lighting, Rooftop Units, Windows, Water Heater Lender: One Community Bank County: Dane |
The EdgePACE Financing: $1,420,000
Annual Estimated Savings: $54,763 Improvements: Roof Insulation, Wall Insulation, Window Upgrades, LED Lighting, Garage DCV Lender: One Community Bank County: Dane |
Fox Crossing Hotel Group, LLCPACE Financing: $850,000
Annual Estimated Savings: $41,008 Improvements: Insulation, Window Upgrades, LED Lighting, PTAC, HVAC-AC/SS, Pool Heater, Low-flow Faucets and Shower Fixtures Lender: Greenworks Lending County: Winnebago |
Kenosha's Weiskopf School ApartmentsPACE Financing: $250,000
Annual Estimated Savings: $2,134 Improvements: LED Lighting, Insulation, Roofing, and High-Efficiency Windows and HVAC Equipment Lender: Greenworks Lending County: Kenosha |
|
Hotel IndigoPACE Financing: $1,500,000
Annual Estimated Savings: $89,832 Improvements: HVAC, Windows, Building Shell, Lighting Lender: Greenworks Lending County: Dane |
|
|
|
|
|
|
Resources
©
2019 PACE WISCONSIN | 1.800.522.3014